THE BEGINNING

Pubali Engineering & Construction Co. Ltd (PECCL) is altering the features of the civil construction industry by amalgamating years of experience with a singular passion for outstanding work. Headqurtered in Dhaka capital af Bangladesh, PECCL is owned by the owners of Pubali Construction Co. Ltd. to concentrate on heavy civil construction project with latest technology.

Today we are a single, solid organization participating in light and heavy civil construction projects, with focus on Civil and Building, Road & Bridges construction, Environmental Redemption & Maintenance Project i.e. earthworks, excavation, site infrastructure, sewers, drainage schemes, specialist buildings, culverts, roadwork's, environmental improvements, steel framed structures toll operations and maintenance.

Our adaptable, professional teams bring added value to our clients' businesses through their expertise and knowledge.

Management Philosophy

We believe that financial success, growth, and industry respect all begin with a quality work environment. Pubali encourages informal communication within the company, seeking suggestions and supporting innovation. We believe in promoting from within and creating a workplace that both challenges individuals and holds them accountable.

Pubali will continue to expand its operations. both in geography and work type. by leveraging our depth of experience, commitment to innovation and pursuit of new and unique opportunities. We also remain committed to supporting the communities we live in and believe that strengthening our roots leads to a stronger company with loyal, lifelong team members

This is an advantage wherever the opportunities of the marketplace may take us.We will continue to invest in local aggregate resources and fined-based production facilities to keep our traditional markets strong and viable for the long term. Pubali believes in honesty and integrity. Our goal is to conduct ourselves at all times in such a way that the customer receives the highest quality work and service for the lowest possible cost.

Financial Information

Our turnover and size are only relevant to our clients to show that we are large enough for the task. We never want to be the biggest - only the best
Year 2010-2011 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016
Turnover USD 226.85 Million USD 167 Million USD 191 Million USD 95 Million USD 98 Million USD 161 Million

Equipments

PECCL continuing Investment in plant and equipment is just one factor in our success. Others include qualified and professional management team and a highly skilled permanent workforce: both undergo ongoing training to provide the highest standards and technical knowledge. Operationally, our equipment fleet is extensive and updated yearly. Our warehouse and dispatching station are centrally located and well organized. All the equipments that PECCL currently have are stated below:

Health & Safety

Workplace health and safety is a part of Pubali‘s (PECCL) normal management systems. Like any other international contractors we consider in advance how we will ensure workplace health and safety. To maintain that we consider the following steps:

  • How the work that is to be undertaken is e.g. ll will there be demolition work before any other work is to start.
  • Where is the work to be undertaken, e.g. will there be confined space work.
  • Who is to be involved. e.g.the number of people involved will decide the amount of protective equipment needed.
  • What special skills are likely to be involved or required, e.g. will people with certificates be required and
  • What plant or equipment is needed, e.g. Suitability of the crane.

These are the part of our Risk Management system. For the safety of the workers, we provide the following Personal
Protective Equipments:

  • Helmet
  • Eye Protective Glass
  • Uniform
  • Safety Belt
  • Hand Gloves
  • Hand Gloves for Welders
  • Safety Shoes

Projects

Construction of Canteen Building 2 for Karnaphully Shoe Industries (KSI) at KEPZ, Chittagong.

Employer: Karnaphully Shoe Industried (KSI),
House #14, Road # 7c, Uttara, Dhaka, Bangladesh
Commencement Date of Work: Nov.2014, Scedule of Completion: Aug, 2015.

Nature of Work

Site Preparation
Earth work in Excavation - 3,762.12 cum
Earth filling by Excavated Soil - 2,128.45 cum
Sand filling by Carried Sand - 3,574.10 cum
One Layer Flat break soling - 7,125.24 cum
RCC work in foundation, column, beam & slab etc. - 4,075.58 cum
Shuttering work for RCC work - 24,856.75 sqm

Value of Contract: US$ - 15 Million

Construction of 4x Factory Building (5th Phase) for Karnaphully Shoe Industries (KSI) at KEPZ, Chittagong.

Employer: Karnaphully Shoe Industried (KSI),
House #14, Road # 7c, Uttara, Dhaka, Bangladesh
Date of Commencement of Work: Nov.2013, Scedule of Completion: Jan. 2015

Nature of Work

Site Preparation
Earth work in Excavation - 12,858.30 cum
Earth filling by Excavated Soil - 5,592.82 cum
Sand filling by Carried Sand - 12,778.83 cum
One Layer Flat break soling - 15,688.68 cum
RCC work in foundation, column, beam & slab etc. - 16,619.26 cum
Shuttering work for RCC work - 49,771.39 sqm

Value of Contract: US$ - 26 Million

Construction of Canteen Building 1 for Karnaphully Shoe Industries (KSI) at KEPZ, Chittagong.

Employer: Karnaphully Shoe Industries (KSI),
House #14, Road # 7c, Uttara, Dhaka, Bangladesh
Date of Commencement of Work: Nov.2013, Schedule of Completion: Jan. 2015

Nature of Work

Site Preparation
Earth work in Excavation - 3,381.43 cum
Earth filling by Excavated Soil - 2,018.32 cum
Sand filling by Carried Sand - 3,311.70 cum
One Layer Flat break soling - 7,087.00 cum
RCC work in foundation, column, beam & slab etc. — 4,013.26 cum
Shuttering work for RCC work - 23,342.68 sqm

Value of Contract: US$ - 5 Million

Construction of Youngoune Aircraft Hanger, Apron 8: Taxiway Project (Civil Works) at Shahjalal International Airport, Dhaka.

Employer: Youngone (CEPZ) Ltd. House # 42, Road # Lake Drive Road, Sector-7, Uttara, Dhaka-1230. Tel:+88-02-89136093953859, Fax: +88-02-8913609
E-mail: flighttops@youngone.co.kr
Date of Commencement of Work: Oct.2012, Schedule of Completion: July. 2014

Nature of Work

Site Preparation
Earth work in Excavation - 2,425.00 cum
Earth filling by Excavated Soil - 1,795.00 cum
Sand filling by Carried Sand - 1,167.00 cum
One Layer Flat break soling - 3,645.00 cum
RCC work in foundation, column, beam 8: slab etc. - 782.00 cum
Shuttering work for RCC work - 1,299.7 sqm

Value of Contract: US$ - 4 Million

Construction of 4x Factory Building (3rd Phase) for Karnaphully Shoe Industries (KSI) at KEPZ, Chittagong.

Employer: Karnaphully Shoe industries (KSI),
House #14, Road # 7c, Uttara, Dhaka, Bangladesh
Dat of Commencement of Work: Sept.2012, Schedule of Completion: July. 2013

Nature of Work

Site Preparation
Earth work in Excavation - 11,255.10 cum
Earth filling by Excavated Soil - 5,605.17 cum
Sand filling by Carried Sand - 11,111.20 cum
One Layer Flat break soling - 15,580.58 cum
RCC work in foundation, column, beam & slab etc. - 16,448.62 cum
Shuttering work for RCC work - 48.196.32 sqm

Value of Contract: US$ - 24 Million

Construction of 4x Factory Building (4th Phase) for Karnaphully Shoe Industries (KSI) at KEPZ, Chittagong.

Employer: Karnaphully Shoe industries (KSI),
House #14, Road # 7c, Uttara, Dhaka, Bangladesh
Date of Commencement of Work: Nov.2013, Schedule of Completion: Aug. 2014

Nature of Work

Site Preparation
Earth work in Excavation - 12,671.60 cum
Earth filling by Excavated Soil - 56,310.10 cum
Sand filling by Carried Sand - 12,644.93 cum
One Layer Flat break soling - 15,489.39 cum
RCC work in foundation, column, beam & slab etc. - 16,447.87 cum
Shuttering work for RCC work - 49,662.47 sqm

Value of Contract: US$ - 25.5 Million

Construction of YCL-8 (Six Storied Building) at Sector-2, CEPZ.

Employer: Youngone (CEPZ) Ltd., Plot # 11-16, Sector # 2, CEPZ, Chittagong,
Bangladesh. Phone: 31 -740431 -6, Fax: 31 —740044, E—mai|: techdiv@youngonectg.com
Date of Commencement of work: Nov 2011, Schedule Completion: Dec. 2013

Nature of Work

Site Preparation ~ 2,460.00 sq m.
Earth work in Excavation— 3,672.00 cum.
Earth filling by Excavated Soil: 2,203.00 cum.
Sand filling by carried sand - 5,766.00 cum.
Brick Flat Soling - 1,750.00 cum.
Lean Concrete (75mm thick.) — 144.00 cum.
RCC work in foundation, column, beam, and slab etc.— 6,360.00 cum.
Shuttering workfor RCC work- 24,313.00 sqm.
Reinforcement bar works for Above RCC work: 696.85 M. Ton.
Brick work (250mm)- 1,032.00 cum.
Plaster work~ 20,515.00 sqm.
Floor Finishing -11,948.00 sqm.
Painting Works- 30,546.00 Sqm.

Value of Contract: US$ - 8 Million

Construction of 120 TPD Coconut Oil Plant Factory at Bagerbazar, Gazipur Sadar, Gazipur.

Employer: Marico Bangladesh Ltd. House # 01, Road # 01, Sector # O1, Uttara,
Dhaka.Tel: +88—O2-8931202 (Hunting), Fax: +88-02—8932322
Date of Commencement of work: August 201 1
Schedule Completion: March 2013

Nature of Work

PPE, Safety, Health 84 Environment
Excavation of foundation, dewatering, sand filling, back filling.
Construction ofOil Mill, copra silo, copra building, oil tank—cake silo, loading bay, cake bagging.
RCC casting rebar work, brick work, plastering, painting, grouting, M.S. bolt fixing,Ti|es, False Ceiling, Thai Aluminium work, laouver, Door, window, septic tank, sanitary, plumbing, re—p|antation, landscaping etc.
Construction & Development of Deep Tube well.

Value of Contract: US$ - 5 Million

Construction of Fael-Khair School-cum-Cyclone Shelters, Contract No. BD1-0014 (Package-2), Execution by DCL-PCCL JV. UV Portion: For DCL- 70% & For PCCL — 30%)

Employer: WSP International Management Consulting
FAEL KHAIR SCHOOL—cum—SHELTERS PROGRAM, House No. 09, Road No. 11, Baridhara, Dhaka-1 21 2. Tel: +88-02-8825761 , 881 1075, Fax: +88-02—882371 3
Email: pmc@wspdhaka.com
Date of Commencement of work: July 2011
Schedule Completion: Dec. 2013

Nature of Work

PPE, Safety, Health & Environemnt.
Foundation Excavation, bailing out water, sand filling, backfilling, site development.
Construction of33 Nos. (2— storied) School cum Cyclone Shelter with raft foundation, in situ pile, precast pile, combined footing foundation.
Pile static load test, integrity test.
Testing of water used, material test, trial mix design for concrete work.
RCC casting, rebar work, steel form work, scaffolding, brick work, plastering, painting, patent stone, screeding, sanitary, plumbing, concealed electrification,septic tank, tube well boring & development, Door, window, surface drain, anti-termite, blackboard, signboard, protective work, Tile works etc.

Value of Contract: US$ - 24 Million

Construction of 2x ware House for KSI at KEPZ, Chittagong of Karnaphuli Shoes Industries Ltd.

Employer: Karnaphuli Shoes Industries (KIS) Ltd. House # 14, Road # 7c, Uttara, Dhaka,Bangladesh.
Start Date: April 201 1
Completion Date: January 2012

Nature of Work

Site Preparation: 16,128.00 sqm.
Earth work in Excavation: 3,306.00 cum.
Earth filling by Excavated Soil: 3,306.00 cum.
Sand filling by carried sand: 6,048.00 cum.
Brick Beds layer: 2,419.00 cum.
Lean Concrete 75mm thick: 203.76 cum.
RCC work in foundation, column, beam, and slab etc: 3678.57 cum.
Shuttering work for RCC work: 2,476.00 sqm.
Reinforcement bar works for Above RCC work: 153.67 M.Ton.
Brick work (250mm): 378.78 cum.
Plaster work: 3,745.00 sq m.
Floor Finishing: 16,128.00 sqm.

Value of Contract: US$ - 3 Million

Construction of Coal Boiler Room for KSI at KEPZ of Karnaphuli Shoes Industries Ltd.

Employer: Karnaphuli Shoes Industries (K|S) Ltd. House # 14, Road #0 7c, Uttara, Dhaka, Bangladesh.
Start Date: December 2011
Completion Date: March 2012

Nature of Work

Site Preparation.
Earth work Excavation: 432.00 cum.
Earth filling: 302.00 cum.
Lean Concrete: 86.00 cum.
RCC work: 637.00 cum.
Brick work (250mm): 63.00 cum.
Painting works: 508.00 sq m.
Plaster works: 508.00 sqm.
Floor Finishing works: 1,108.00 sqm.
Shuttering works: 1,098.28 sqm.
Re-bar works: 24.66 Tones.

Value of Contract: US$ - 2.2 Million

Execution of In situ test piles, additional piles, deep tube well under MTHojgaard in connection with Saidabad Water Treatment Plant

Phase-ll, Dhaka WASA, Dhaka.
Employer: Dhaka WASA, Dhaka.
Start Date: 01-1 1—201 1
Completion Date: June 2011

Nature of Work

Work permit, Health, Safety 8: Environment, Boring 8: casting of In situ Piles (dia 600 8:750 mm, L= 22m- 25m, 70 nos), Boring, supply, installation, development 8.: commissioning of 8”dia deep tube well with 3" dia delivery submersible pump — 1 set.

Value of Contract: US$ - 1.1 Million

Construction of YSS Extension Project.

Employer: Youngone (CEPZ) Ltd. Plot # 11-16, Sector # 2, Chittagong Export
Processing Zone, Chittagong, Bangladesh. Tel: +31 —740431 -6, 740043
Fax: +31 —740044, 740015, E-mail: techdiv@youngone.co.kr
Start Date: May 2009
Completion Date: Sept. 2009

Nature of Work

Site Preparation: 3,024.00 sqm.

Earth work in Excavation: 441 .00 cum.
Earth filling by Excavated Soil: 143.00 cum.
Sand filling by carried sand: 2,719.00 cum.
Bricks Flat Soling: 2,970.00 Sqm.
Lean Concrete (75mm thick.) :40.58 cum.
RCC work in foundation, column, beam, and slab etc.: 545.7 cum.
Reinforcement bar works for Above RCC work: 12.00 M. Ton.
Brick work (250mm): 110.00 cum.
Plaster work: 210.00 sqm.
Floor Finishing : 2,758.00 sqm.
Painting works: 924.00 sqm.

Value of Contract: US$ - 3.2 Million

Construction of YSS-5 New Canteen Building, U/G Water Tank, Internal Road & Land Development at Plot # 1 8: 2, Sector-2A.

Employer: Youngone (CEPZ) Ltd. Plot # 11-16, Sector # 2, Chittagong Export
Processing Zone, Chittagong, Ba ng|adesh.Tel: +31 —740431 -6, 740043
Fax: +31 740044, 740015, E-mail: techdiv@youngone.co.kr
Start Date: October 2010
Completion Date: January 2011

Nature of Work

Earth work in Excavation: 1,595.00 cum.
Earth filling by Excavated Soil: 815.00 cum.
Sand filling by carried sand: 1,071.00 cum.
Brick Flat Soling: 940.00 cum.
Plain Concrete (7Smm thick.): 75.5 cum.
RCC work in foundation, column, beam, and slab etc.: 736.47.00 cum.
Shuttering work for RCC work: 635.00 sqm.
Reinforcement bar works for Above RCC work: 80.1 9 M. Ton.
Brick work (250mm): 182.50 cum.
Plaster work: 2636.00 sqm.
Floor Finishing: 1,298.00 sqm.
Painting Works: 2,636.00 Sq m.

Value of Contract: US$ - 3.2 Million

Construction of Factory Building and Effluent Treatment Plant ( ETP ) of capacity 300 m3/hr (Phase-ll), Adamjee EPZ, Narayangonj.

Employer: Kwun Tong Apparels Ltd. Shed No. 1& 2, Plot # 59-87, AEPZ, Adamjeenagar, Na rayangonj, Bangladesh.Tel:+88-02-7691 791 Fax: +88-02-7608298
Start Date: 10.09.2008
Completion Date: 10.03.2010

Nature of Work

Work permit, Health Safety & Environment, Earth work for foundation, rebar, scaffolding, steel form work, R.C.C casting, brick work, plastering, grouting, wood work, tiles, sanitary, plumbing & water supply, electrical wiring, fire fighting, painting, Damp Proof etc.

Value of Contract: US$ - 4.4 Million

Pump House Station at Kallyanpur under Obyashi Corporation, Japan.

Start Date: 25.10.2007
Completion Date: 31.03.2009

Nature of Work

Work permit, Health Safety 8: Environment, Earth work for foundation, rebar, scaffolding, steel form work, R.C.C ca sting, brick work, plastering, grouting, wood work, tiles, sanitary, plumbing & water supply, electrical wiring, fire fighting, painting, Damp Proof etc.

Value of Contract: US$ - 5.5 Million

Construction of Factory Building (Phase-I), Adamjee EPZ, Narayangonj.

Employer: Kwun Tong Apparels Ltd. Shed No. 1& 2, Plot # 59-87, AEPZ,
Adamjeenagar, Narayangonj, Bang|adesh.Te|: +88-O2-7691791, Fax: +88-02-76082 98
Start Date: 01.08.2006
Completion Date: 28.02.2007

Nature of Work

Work permit, Health Safety 8: Environment, Earth work for foundation, rebar, scaffolding, steel form work, R.C.C casting, brick work, plastering, grouting, wood work, tiles, sanitary, plumbing 84 water supply, electrical wiring, fire fighting, painting, Damp Proof etc.

Value of Contract: US$ - 8.9 Million

Construction of 600 Seated Modern Auditorium Building at BRDTI, Khadimnagar, Sylhet.

Employer: Bangladesh Rural Development Board (BRDB), 5 Kawran Bazar C/A, Dhaka.
Start Date: May 2005
Completion Date: 30.08.2006

Nature of Work

Work permit, Health Safety & Environment, Earth work for foundation, rebar, scaffolding, steel form work, R.C.C ca sting, brick work, plastering, grouting, wood work, tiles, sanitary, plumbing & water supply, electrical wiring, fire fighting, painting, Damp Proof etc.

Value of Contract: US$ - 4.5 Million

Construction of Cyclone Shelter.

Employer: Shimizu Corporation, Japan.
Start Date: Aug. 2004
Completion Date: June 2006

Nature of Work

Earth work, rebar, R.C.C casting, form work, brick work, plastering, sanitary, plumbing, deep tube well, plumbing, wood work, steel work, white washing, painting etc.

Value of Contract: US$ - 3.6 Million

Construction of 07 (Seven) Storied Staff Dormitory Building at Chittagong.

Employer: Youngone (BD) Ltd. Chittagong, Bangladesh.
Start Date: Dec. 2002
Completion Date: August, 2004

Nature of Work

Work permit, Health Safety & Environment, Earth work for foundation, rebar, scaffolding, steel form work, R.C.C casting, brick work, plastering, grouting, wood work, tiles, sanitary, plumbing & water supply, electrical wiring, fire fighting, painting, Damp Proof etc.

Value of Contract: US$ - 6.6 Million

Construction of 4-Storied Youngone Hi—Tech Sports Wear Annex Complex
Total Constructed Building Area:4,500 sqm.
Employer: You ngone Hi—Tech Sports Ind. Ltd., DEPZ, Savar, Dhaka.
Start Date: October 2001
Completion Date: May 2003

Nature of Work

Work permit, Health Safety & Environment, Earth work for foundation, rebar, scaffolding, steel form work, R.C.C casting, brick work, plastering, grouting, wood work, tiles, sanitary, plumbing & water supply, electrical wiring, fire fighting, painting, Damp Proof etc.

Value of Contract: US$ - 5.1 Million

Construction of Dyeing, Spinning Factory Building including 4 (four) storied Administrative Building & Dormitory House at Plot No. 224-260 and 94-101, Dhaka Export Processing Zone (Extension), Savar, Dhaka.

Employer: Ring Shine Textile Ltd. Plot # 224-260, Extension Area DEPZ,
Ganakbari, Savar, Dhaka, Bang|adesh.Te|: +88-02—7701388
Start Date: Aug. 1998
Completion Date: January. 2003

Nature of Work

Dyeing Factory Building, Sweater Building, Spinning Building, Ware House, Canteen, Overhead Water Tank, and underground Water Reservoir, 4 Noose. Boundary Fence, RCC & bituminous road etc., Polar dyeing factory, Cone dyeing factory, Ya rn Processing factory, Ware House, Dormitory and Others, Effluent Treatment Plant—Capacity 1 00m3/hr. a) Equalization Tank — Size: 35mx2Smx4mD, b) Aeration Tank— Size: 50mx25mx5mD, c) ClarifierTank— Size: Dia l5m., cl) Sludge Tank - Size: 20mx10mx2.5mD

Value of Contract: US$ - 16.8 Million

Construction of Factory Building and other ancillary work at Plot No. 133 to 148), DEPZ (Extension), Savar, Dhaka.

Employer: Kung Keng Textile (Bangladesh) Co. Ltd. DEPZ (Extension), Plot #
135-146, Savar, Dhaka, Bangladesh. Tel: +88—02-7701 142-44, Fax: +88-02-7701 145
E-mail: kktb@bol-online.com
Start Date: January 2001
Completion Date: June 2003

Nature of Work

(i) Factory Building Area (Dyeing and Spinning Factory Building- 21,675 Sqm.), Concrete work, brick work, underground RCC Duct and erection of Pre-Feb Steel Structure &
(ii) Construction of underground water Reservoir, Waste watertreatment plant, three storied office building, Generator house, RCC Road, Boundary fence etc.

Value of Contract: US$ - 5.6 Million

 

Road Works

Development/Preparation of Construction Yard for Pad ma Multipurpose Bridge project at Mawa (North), Munshigonj during the year 2010-2011.

Employer: Project Director, Bangladesh Bridge Authority, Padma Multipurpose Bridge, Shetu Bhaban, Banani, Dhaka.
Start Date: January 2011
Completion Date: Dec. 2012

Nature of Work

Excavation for GEO bags Slope Protection & Apron etc.: 1,60,000.00 cum.
Supply 8: Place of 250 kgs GEO bags for Slope Protection: 1,25,000.00 Nos.
Supply & Place of 125 kgs GEO bags for Apron : 1,S5,000.00 Nos.
Earth Filling by carried Earth/Sand: 15,00,000.00 cum.

Value of Contract: US$ - 10 Million

Contract Package No.: PMP 2007-08/23l0ver|ay 8: DBST works (Tranche-3) under RHD, Dist.- Bogra.

Employer: Employers Representative, PMP 2007-2008 & Additional Chief Engineer, RH D, Planning & Maintenance Wing, Sarak Bha ban, Ram na, Dhaka.
Start Date: 18.06.2008
Completion Date: Dec. 2010

Nature of Work

Earth Shoulder: 2,307.6 m3
Hard Shoulder: 2,934.4m3
Premix Bituminous Carpeting: 920.15 m3
Tack Coat: 21,879.00 sq m.
DBST Work: 1,73,491 .800 sqm.
DBS Wearing Course: 2,135.25 m3
Road Marking: 7,737.14 sqm.

Value of Contract: US$ - 3.1 Million

01-PRC/2005-2006 (Construction of 1 85.99 M. long pre-stressed girder R.C.C. bridge in place of Pangashi Bailey Bridge at 9th K.M. of Sirajgonj-Raygonj Road under Road Division Sirajgonj during the year 2005-2006)

Employer: Executive Engineer, RHD (C.C), Road Division, Sirajgonj.
Start Date: 1 January, 2006
Completion Date: 30 June, 2010

Nature of Work

Earth work, execution of In situ piles, Pile Load test, rebar, R.C.C casting, pre-stressing girder, staging, form work, expansion joint, pier, abutment, deck slab, approach road, protective works etc.

Value of Contract: US$ - 6.8 Million

Contract Package No.: PMP 2007-08/19/Overlay works (Tranche-3) under RHD, Dist.- Rajbari.

Employer: Employers Representative, PMP 2007-2008 & Additional Chief
Engineer, RHD, Planning & Maintenance Wing, Sarak Bhaban, Ramna, Dhaka.
Start Date: 06 July 2008
Completion Date: 31, December 2009

Nature of Work

DBS Wearing Course (Plant Method): 1,063.95m3
DBS Wearing Course (50mm thick- Avg.) :9,473.889 m3
Bituminous Tack Coat: 1,98,044.251 sqm.
Earth Shoulder: 10,301.25 m3
Road Marking: 2,720.00 sqm.

Value of Contract: US$ - 7.7 Million

Toll Collection, Operation and Maintenance (T, 0 & M) works of the Hatikamrul-Bonpa ra New Road and associated works under Roads 8: Highways Department.

Employer: Executive Engineer, RHD, Road Division, Natore.
Start Date: 10th May 2003
Completion Date: 9th May 2008

Nature of Work

Collection & Control of Toll revenue and banking of toll revenue. Safekeeping, handling, transporting & reconciliation Control of traffic through the Toll Plaza area. Toll reporting & administration. Independent toll audit system management. General maintenance of bridge, culvert, side/ cross road, traffic road, landscaping, river training, emergency equipment, safety precaution for road accident, road traffic management, response the traffic accident promptly and clear the road for traffic movement etc.

Value of Contract: US$ - 7.1 Million

PM P/2005-2006/04, DBST 8: Overlay Works

(i) Mymensingh-Raghurampur-Netrokona—Mohongonj—Sunamgonj (Ch: 6+800—21+800)
(ii) Mymensingh-Raghurampur-Netrokona-Mohongonj—Sunamgonj Road (Ch: 21 +800-40+950).

Employer: Em p|oyer's Representative, PMP 2005-2006 8: Additional Chief Engineer (RHD), Planning and Maintenance Wing, Sarak Bhaban, Ramna, Dhaka.
Start Date: December, 2004
Completion Date: December, 2005

Nature of Work

Earth Work, Sub Base, Base Course, Asphalt Pavement 8: Road Marking.

Value of Contract: US$ - 4.4 Million

Construction of 180.125m Bridges at Betka Bazar on Betka-Teghoria Road at Upazila on lsamati Delleswari River in Munshigonj.

Employer: Executive Engineer, Local Government Engineering Department, Munshigonj.
Start Date: August, 2004
Completion Date: August 2005

Nature of Work

Earth work, execution of In situ piles, Pile Load test, rebar, R.C.C casting, staging, form work, expansion joint, pier, abutment, deck slab, approach road, protective works etc.

Value of Contract: US$ - 6.6 Million

PMP-2004-2005/15 (Joydebpur-Mawna-Mymensingh Road)

Employer: Executive Engineer, RHD, Road Division, Mymensingh.
Sta rt Date: Dec. 2004
Completion Date: July 2005

Nature of Work

Aggregate Base Type-I : 3,102.7750 cum.
Bitumenous Prime Coat (Plant Placed): 19,913.500 sqm.
Bituminous Tack Coat: (Plant work): 2,04,992.250 sqm.
Dense Bitumenous Surfacing Wearing Course: (Plant Method) : 11,377.5230 cum.

Value of Contract: US$ - 5.6 Million

PMP 2003-2004/O2

(i) Muktisharoni (Folder Road) (ii) Dhaka—Narayangonj Link Road

Employer: Additional Chief Engineer (RHD), Planning and Maintenance Wing, and Superintending Office, PMP-2003-04, Sarak Bhaban, Ramna, Dhaka.
Start Date: 31.01.2004
Completion Date: 21 December, 2004

Nature of Work

Embankment Fill from Borrow Pit in contractors Acquired Land: 19,431.71 cum.
Construction of Hard Shoulder: 300.00 cum.
Scarify, Mix and Recompact Existing Pavement and Shoulder: 1,200.00 sqm.
Repair of Pothole on the Existing Pavement: 152.5099 cum.
Bituminous Tack Coat : 286,251.10 sqm.
Dense Bituminous Surfacing Base Course: 3,459.21 cum.
Dense Bituminous Surfacing Wearing Course: 10,767.S525 cum.
Road Marking-Thermoplastic Material: 4,663.63 sqm.

Value of Contract: US$ - 4.1 Million

RRMP-Ill, Contract No. 2A (Dhaka —Sylhet Road, Mirpur to Aushkandi Junction), Roads 8: Highways Department.

Employer: Project Director, RHD 8: Addl. Cheif Engineer, RRMP— Ill, Sarak Bhaban, Dhaka.
Start Date: 02.07.2001
Completion Date: December, 2004

Nature of Work

Construction of Road of 34 km
Earth work: 15,39,568.00 cum
Sub—base: 2,29,830.00 cum
Base Course: 80,866.00 cum
Asphalt Concrete: 43,660 Ton
Bridge & Culvert concrete works (with 25,020.73 cum. concrete):
DBST1,09,347.00 sqm.

Value of Contract: US$ - 86 Million

RRMP-Ill, Contract No. 1A (Dhaka —Sy|het Road, Kantchpur to Narshingdi Junction), under Roads & Highways Department.

Employer: Project Director, RHD & Addl. Cheif Engineer, RRMP— III, Sa rak Bhaban, Dhaka.
Start Date: 12.10.2000
Completion Date: June, 2004

Nature of Work

Construction of Road of 32 km
Earth work: 17,62,181.00 cum
Subbase: 2,53,170.00 cum
Base Course: 76,765.00 cum
Asphalt Concrete: 48,662.00 Ton
Bridge 8: Culvert Concrete works ( with 65,950.00 cum. Concrete)
DBST 98,326.00 sq m.

Value of Contract: US$ - 91 Million

 

Construction Works in UAE

The Palm Jumeirah Transit System C-PJMC.PB-001

Employer: Project Director, Palm Jumeirah Rail Transit System.
Obayashi Corporation. Jebel Ali, Dubai, UAE.
Start Date: 24 May'2006
Completion Date: October’2009

Value of Contract: US$ - 76 Million

The Palm Jumeirah Transit System JAP006-D117

Employer: Project Director, Palm Jumeirah Mono Rail Civil Joint Venture. Dubai, UAE
Start Date: 16 Ja n'2008
Completion Date: December'201 0

Value of Contract: US$ - 82 Million

Red Line Underground Station Al Rigga 84 City Centre.

Employer: Project Director, Dubai Metro Rail Project, JT METRO JV.
Obayashi Corporation. Dubai, UAE.
Start Date: 30 May'2006
Completion Date: February’2010

Value of Contract: US$ - 110 Million

Green Line Under Ground Station Al Saeediya, Al Gubaiba 8: Al Ras.

Employer: Project Director, Dubai Metro Rail Project, JT METRO JV. Obayashi Corporation. Dubai, UAE.
Start Date: 5 February'2007
Completion Date: Febuary’2011

Value of Contract: US$ - 95 Million

Supply, manage workers and execute construction of Main 8: Cresent Bridges at the Palm Jebel Ali.

Employer: Project Manager, SAMSU NG Corporation, Jebel Ali, Dubai, UAE.
Start Date: 01-08-2007
Completion Date: December'2009

Value of Contract: US$ - 26 Million

Upgrading Al Salam Street and Abu Dhabi City Ring Road, Contract No.1 ( Al Salam Street Tunnel ).

Employer: Project Director, Samsung — Saif Bin Darwish JV. Abu Dhabi, UAE.
Start Date: December’2009
Completion Date: March'2011

Value of Contract: US$ - 61 Million

P.S.M Segment Manufacturing & Installation Work of Main and Crescent Bridges project at the Palm Jebel Ali, Dubai, UAE.

Employer: Project Manager, DONGBANG Engg. Co. Ltd. # 410-92, Oryu— Dong, Seo-Gu, Incheon, Korea.
Start Date: 01-1 1-2007
Completion Date: November’2009

Value of Contract: US$ - 21 Million

 

Bangladesh Office

Flat # A4, Plot # 4, Road # 12, Block - J, Baridhara, Dhaka 1212
Tel: +88-02-8833344
Mob: +88 017 11407010
E-mail: pubalienc@gmail.com, aks@pubaliconst.com
Web: www.pubaliconst.com
Mr. A K Siddiquee
Managing Director
aks@pubaliconst.com

Associate Company: Aksid Corporation
(Sika Exclusive Agents Construction Chemical)
Website: www.aksidcorp.com

Dubai Office

Flat # 306, Plot # 395 (129-331), Ali Obaid Building, Port Saeed
P.O. Box # 186172
Daira, Dubai, U.A.E.
E-mail: aks@pubaliconst.com