Site Preparation, Piling Works, Sheet Piling, Earthwork in Excavation, Earth filling by Excavated Soil, Sand filling by carried sand, Mat & Pile Cap, Lean Concrete (75mm thick.), RCC work in the foundation, column, beam, and slab, etc., Shuttering work for RCC work, Reinforcement bar works for Above RCC work, Brickwork (125mm, 250mm), Plasterwork, Floor Finishing, Painting Works.