Site Preparation, Earth work in Excavation, Earth filling by Excavated Soil, Sand filling by carried sand, Brick Flat Soling, Lean Concrete (75mm thick.), RCC work in foundation,Steel Erection, Small Silo Construction, column, beam, and slab etc., Shuttering work for RCC work, Reinforcement bar works for Above RCC work, Brick work (125mm, 250mm), Plaster work, Floor Finishing.