Site Preparation, Piling Works, Earth work in Excavation, Earth filling by Excavated Soil, Sand filling by carried sand, RCC work in foundation, column, beam, and slab etc., Shuttering work for RCC work, Reinforcement bar works for Above RCC work, Brick work (125mm, 250mm), Plaster work, Floor Finishing, Painting Works.