Site Preparation, Earth work in Excavation – 12,858.30 cum, Earth filling by Excavated Soil – 5,592.82 cum, Sand filling by Carried Sand – 12,778.83 cum, One Layer Flat break soling – 15,688.68 sqm, RCC work in foundation, column, beam & slab etc. – 16,619.26 cum, Shuttering work for RCC work – 49,771.39 sqm