Canteen Building 1 for Karnaphully Shoe Industries (KSI) at KEPZ, Chittagong.
Employer: Canteen Building 1 for Karnaphully Shoe Industries (KSI) at KEPZ, Chittagong.
Nature of Works:
Site Preparation, Earth work in Excavation – 3,381.43 cum, Earth filling by Excavated Soil – 2,018.32 cum, Sand filling by Carried Sand – 3,311.70 cum, One Layer Flat break soling – 7,087.00 sqm, RCC work in foundation, column, beam & slab etc. – 4,013.26 cum, Shuttering work for RCC work – 23,342.68 sqm