Site Preparation, Earth work in Excavation – 3,762.12 cum, Earth filling by Excavated Soil – 2,128.45 cum, Sand filling by Carried Sand – 3,574.10 cum, One Layer Flat break soling – 7,125.24 Sqm, RCC work in foundation, column, beam & slab etc. – 4,075.58 cum, Shuttering work for RCC work – 24,856.75 sqm