PPE, Safety, Health & Environment – Foundation Excavation, bailing out water, sand filling, backfilling, site development. – Construction of 33 Nos. (2- storied) School cum Cyclone Shelter with raft foundation, in situ pile, precast pile, combined footing foundation.
– Pile static load test, integrity test. – Testing of water used, material test, trial mix design for concrete work. – RCC casting, rebar work, steel form work, scaffolding, brick work, plastering, painting, patent stone, screeding, sanitary, plumbing, concealed electrification, septic tank, tube well boring & development, Door, window, surface drain, anti-termite, black board, signboard, protective work, Tile works etc.