Pubali Engineering & Construction Co. Ltd

+88 028418682

2x ware House for KSI at KEPZ, Chittagong of Karnaphuli Shoes Industries Ltd.

By:   sjnayem

2x ware House for KSI at KEPZ, Chittagong of Karnaphuli Shoes Industries Ltd. Employer: Karnaphuli Shoes Industries (KIS) Ltd. House # 14, Road # 7c. Uttara, Dhaka, Bangladesh. Nature of Works:   Site Preparation: 16,128.00 sqm.Earth work in Excavation: 3,306.00 cum.Earth filling by Excavated Soil: 3,306.00 cum.Sand filling by carried sand: 6,048.00 cum.Brick Beds layer: […]

Fael-Khair School-cum-Cyclone Shelters, Contract No. BD1-0014 (Package-2), Execution by DCL-PCCL JV. (JV Portion: For DCL- 70% & For PCCL – 30%), House No. 11, Road No. 19/A, Sector-04, Uttara Model Town, Dhaka-1230.

By:   sjnayem

Fael-Khair School-cum-Cyclone Shelters Employer: WSP International Management Consulting FAEL KHAIR SCHOOL-cum-SHELTERS PROGRAM, House No. 09, Road No. 11, Baridhara, Dhaka-1212. Tel: +88-02-8825761,8811075, Fax: +88-02-8823713 Email: pmc@wspdhaka.com Nature of Works:   PPE, Safety, Health & Environment– Foundation Excavation, bailing out water, sand filling, backfilling, site development.– Construction of 33 Nos. (2- storied) School cum Cyclone Shelter […]

120 TPD Coconut Oil Plant Factory at Bagerbazar, Gazipur Sadar, Gazipur.

By:   sjnayem

120 TPD Coconut Oil Plant Factory at Bagerbazar, Gazipur Sadar, Gazipur. Employer: Marico Bangladesh Ltd. House# 01, Road #01, Sector #01, Uttara, Dhaka.Tel: +88-02-8931202 (Hunting), Fax: +88-02-8932322 Nature of Works:   PPE, Safety, Health & EnvironmentExcavation of foundation, dewatering, sand filling, back filling, Construction of Oil Mill, copra silo, copra building, oil tank-cake silo, loading […]

YCL-8 (Six Storied Building) at Sector-2, CEPZ.

By:   sjnayem

YCL-8 (Six Storied Building) at Sector-2, CEPZ. Employer: Youngone(CEPZ) Ltd., Plot# 11-16, Sector #2,CEPZ, Chittagong, Bangladesh. Nature of Works: Site Preparation – 2,460.00 sqm.Earth work in Excavation- 3,672.00 cum.Earth filling by Excavated Soil: 2,203.00 cum.Sand filling by carried sand – 5,766.00 cum.Brick Flat Soling – 1,750.00 cum.Lean Concrete (75mm thick.) -144.00 cum.RCC work in foundation, […]

4x Factory Building (4th Phase) for Karnaphully Shoe Industries (KSI) at KEPZ, Chittagong.

By:   sjnayem

4x Factory Building (4th Phase) for Karnaphully Shoe Industries (KSI) at KEPZ, Chittagong. Employer: Karnaphully Shoe Industried (KSI), House #14, Road # 7c, Uttara, Dhaka, Bangladesh Nature of Works:   Site PreparationEarth work in Excavation – 12,671.60 cumEarth filling by Excavated Soil – 56,310.10 cumSand filling by Carried Sand – 12,644.93 cumOne Layer Flat break […]

4x Factory Building (3rd Phase) for Karnaphully Shoe Industries (KSI) at KEPZ, Chittagong.

By:   sjnayem

4x Factory Building (3rd Phase) for Karnaphully Shoe Industries (KSI) at KEPZ, Chittagong. Employer: Karnaphully Shoe Industried (KSI), House #14, Road # 7c, Uttara, Dhaka, Bangladesh Nature of Works:   Site PreparationEarth work in Excavation – 11,255.10 cumEarth filling by Excavated Soil – 5,605.17 cumSand filling by Carried Sand -11,111.20 cumOne Layer Flat break soling […]

Youngoune Aircraft Hanger, Apron & Taxiway Project (Civil Works) at Shahjalal International Airport, Dhaka.

By:   sjnayem

Youngoune Aircraft Hanger, Apron & Taxiway Project (Civil Works) at Shahjalal International Airport, Dhaka. Employer: Youngone (CEPZ) Ltd. House # 42, Road # Lake Drive Road, Sector-7, Uttara, Dhaka-1230. Tel:+88-02-8913609,8953859, Fax: +88-02-8913609 E-mail: flighttops@youngone.co.kr Nature of Works:   Site PreparationEarth work in Excavation – 2,425.00 cumEarth filling by Excavated Soil -1,795.00 cumSand filling by Carried […]

Canteen Building 1 for Karnaphully Shoe Industries (KSI) at KEPZ, Chittagong.

By:   sjnayem

Canteen Building 1 for Karnaphully Shoe Industries (KSI) at KEPZ, Chittagong. Employer: Canteen Building 1 for Karnaphully Shoe Industries (KSI) at KEPZ, Chittagong. Nature of Works:   Site Preparation, Earth work in Excavation – 3,381.43 cum, Earth filling by Excavated Soil – 2,018.32 cum, Sand filling by Carried Sand – 3,311.70 cum, One Layer Flat […]

4x Factory Building (5th Phase) for Karnaphully Shoe Industries (KSI) at KEPZ, Chittagong.

By:   sjnayem

4x Factory Building (5th Phase) for Karnaphully Shoe Industries (KSI) at KEPZ, Chittagong. Employer: Karnaphully Shoe Industried (KSI), House #14, Road # 7c, Uttara, Dhaka, Bangladesh. Nature of Works:   Site Preparation, Earth work in Excavation – 12,858.30 cum, Earth filling by Excavated Soil – 5,592.82 cum, Sand filling by Carried Sand – 12,778.83 cum, […]

Canteen Building 2 for Karnaphully Shoe Industries (KSI) at KEPZ, Chittagong.

By:   sjnayem

Canteen Building 2 for Karnaphully Shoe Industries (KSI) at KEPZ, Chittagong. Employer: Karnaphully Shoe Industried (KSI), House #14, Road # 7c, Uttara, Dhaka, Bangladesh Nature of Works:   Site Preparation, Earth work in Excavation – 3,762.12 cum, Earth filling by Excavated Soil – 2,128.45 cum, Sand filling by Carried Sand – 3,574.10 cum, One Layer […]